New shower in a former tub alcove with a low tiled curb and a recessed niche

What Affects Tub-to-Shower Conversion Cost in Southlake, TX

On this page
  1. What a tub-to-shower conversion quote should include
  2. Three things that can affect the cost
  3. How to plan the order of the work
  4. How to compare Southlake quotes
  5. Frequently asked questions
  6. Talk through your conversion

For a tub-to-shower conversion in Southlake, our typical range is $15,000 to $20,000 when the rest of the bathroom stays as it is. The same conversion range applies to any tub, including a corner garden tub or a tub in an alcove. You get a written scope and one set price for the work it lists. Choosing a curbless entry adds $3,500. For more, see our Southlake walk-in shower page.

Older white tub alcove with square tile and an old three-handle valve before a conversion

Decide which parts of the bathroom you want to keep. If you also want a new vanity, new flooring across the room or a different layout, ask for those items to be listed separately. Clear boundaries make it easier to compare quotes and see what’s driving the cost.

Planning a bathroom remodel? Tell us what you want to change. 3 quick taps, then we call you.

Plan my remodelSee our work

What a tub-to-shower conversion quote should include

Ask whether the quote covers removing the tub and surround and hauling them away. Check the scope for drain or valve work, wall and floor preparation, the shower base, waterproofing, tile, glass, fixtures and patching where the shower meets the rest of the room. We use Schluter waterproofing under the tile.

Look closely at those edges. If you want to keep the bathroom floor, ask where the shower tile stops and how the entry meets that floor. If the tub surround reaches a window or a painted wall, ask which areas will be repaired after demolition. A sketch or a marked photo can help you and the remodeler agree on where the work ends.

Ask the remodeler to show you what will be behind the tile. The scope can list wall and floor preparation, the waterproofed areas and how the entry and drain fit together. It can also say which fixtures you’ll supply and who’ll order the glass. Ask for those details in writing so the work is easy to compare.

Three things that can affect the cost

The plumbing and conditions behind the tub

The tub drain and valve may need to move or be adjusted to fit the new shower. The remodeler can look at their locations during the walkthrough. Opening the walls and floor can also reveal damp framing or a soft section of floor that needs repair before the shower goes in. Ask which plumbing work is included and how you’ll see the scope and price of any repair found after demolition.

The tile and how far it runs

Tile choice affects the material cost. The area it covers and the cuts required affect the work. Decide how high you want the tile to go and whether you want a niche or bench. Ask where tile, trim and the waterproofing beneath them are included. If you’re comparing options, ask what changes in the quote when you change the tile or how far it runs.

The glass and enclosure layout

We use frameless glass. A fixed panel and an enclosure with a door call for different glass layouts. Show how you want to enter the shower and check where the door would swing. Ask which glass is included, who measures the opening and whether installation is part of the quote. Raise a low step or curbless entry during the walkthrough so the scope can account for the existing floor and drain.

How to plan the order of the work

Use the walkthrough to discuss the layout, entry, tile and fixture locations. Ask which choices you need to make before work starts and which orders depend on finished measurements.

A typical sequence starts with taking out the tub and checking the exposed walls and floor. Any needed rough plumbing follows, then the shower base and waterproofing before tile. Ask what order applies to your bathroom. If the glass is made to fit the opening, ask when it will be measured and installed. Confirm when the fixtures and final walkthrough are planned.

If this is a bathroom you use every day, identify another one you can use during the work. Ask which stretches of the schedule involve work in the room and which depend on a delivery or the next trade.

Ask when the bathroom will be out of use and when it can be used again. Have the remodeler show where repairs, material arrivals, glass fabrication or any required inspection could affect the plan. Those details belong in a schedule for your bathroom.

How to compare Southlake quotes

Start by asking each remodeler to quote the same layout, entry, finish choices and enclosure. Check the drain and valve work, waterproofing, tile limits, glass and repairs at the edges. If something is left open, ask who will decide it and when you’ll see its price in writing.

For example, a proposal may end at the shower opening. Ask who handles a patch where the tub used to meet the bathroom floor. If you’re considering a niche or a different glass door, ask what work each choice adds. You can then choose what belongs in the scope before those materials are ordered.

Also ask how the remodeler would handle a change if demolition reveals damage. A clear quote explains the work you’re agreeing to now and how additional work would be priced for your approval. Keep a copy of the scope and mark any selections still to be made. If you decide to change an item after the walkthrough, you’ll have a record of what the original quote covered.

Frequently asked questions

Can I keep the vanity and the rest of the bathroom floor?

List the vanity and floor in the written scope as areas you want to keep. Ask where the new shower will meet the existing floor and what patching the quote covers.

Is converting a tub the same job as rebuilding a shower?

A conversion starts by removing the tub and planning how the drain, valve and entry will work for a shower. A rebuild starts with a shower already in place. Ask for the quote to describe the actual starting conditions in your bathroom.

Can I get a curbless entry?

Ask during the walkthrough. The existing floor, drain location and meeting point with the rest of the bathroom affect what can be built. Ask for the entry and any work it adds to be shown in the written scope before you compare prices.

Should I check with the City of Southlake?

Yes. Before work starts, ask the City of Southlake what applies to your project. Describe any proposed changes to the drain, valve or layout.

Talk through your conversion

Call Salvation Home Remodeling LLC at 817-210-7117 to discuss your Southlake tub-to-shower conversion. Bring a photo of the tub area, an idea of the entry and glass you want, and a list of what you plan to keep. Ask for a written scope and quote for that work.

Our warranty is 3 years on anything we touch + 5 years workmanship.

Planning a bathroom remodel? Tell us what you want to change. 3 quick taps, then we call you.

Plan my remodelSee our work

Service Area Map
Job costs tracked with Job Cost Pro — built by our owner.

Privacy Policy

Salvation Home Remodeling
Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.