Walk-in shower with a tiled bench, matte black fixtures and a pebble floor

Walk-In Shower Cost in Aledo, TX

On this page
  1. Start with the shower scope
  2. Three things that drive the cost
  3. How the work is scheduled
  4. What to look for in a written estimate
  5. Walk-in shower FAQs
  6. Talk through your Aledo shower

A shower-only rebuild in Aledo typically costs $12,000 to $18,000. Taking out a tub and putting in a walk-in shower typically costs $15,000 to $20,000. A curbless entry adds $3,500 to either job. The first step is to identify which job you have. A written quote for your bathroom should spell out what comes out, what goes in, and what stays. See the shower scopes and prices in our Aledo bathroom planning guide.

River pebble shower floor with a square matte black drain

Start with the shower scope

A shower-only rebuild starts with an existing shower. Ask whether its footprint and drain location can stay and which parts will be removed and rebuilt. A tub-to-shower conversion starts with a tub opening. We give you one set price for the agreed conversion scope, whether you have a corner garden tub or a tub in an alcove. Even if you use the same area, the estimate may need to cover changes to the drain, valve, walls, and shower base. Read about the steps in a tub-to-shower conversion in Keller.

Planning a bathroom remodel? Tell us what you want to change. 3 quick taps, then we call you.

Plan my remodelSee our work

If you want a new vanity, changes around the toilet, or flooring outside the shower, list that work separately. Ask for those items on their own lines so you can see where a full-room quote adds work beyond the shower. A shower estimate can cover removal, plumbing changes, the new base, waterproofing, tile, fixtures, and glass. Ask who supplies and installs the glass and where the new work meets the walls or floor you’re keeping. Mark that edge on a photo or sketch and ask how the estimate handles it. See how the shower scopes are described in our Southlake walk-in shower guide.

Three things that drive the cost

Drain location and plumbing

Ask your remodeler to look at the drain and valve before you settle on a layout. If the existing drain and valve can serve the new shower, ask what plumbing can stay as it is. When a tub comes out, discuss where the new shower base and controls will go before finalizing the plumbing work. Moving either one may mean opening more of the floor or wall. The estimate should show which parts stay, which move, and what work is needed to reach them. If you want the controls within easier reach, ask which positions suit your layout and how they affect the scope.

The base and the work under the tile

Ask how the shower base will slope toward the drain and how the shower’s wet areas will be waterproofed. We use a Schluter waterproofing system under the tile on every shower we build. A curb, a low curb, and an entry with no step each affect how the base meets the bathroom floor. For a no-step entry, have the remodeler look at the floor and drain together before you choose the design. Ask how the estimate handles damage to flooring or framing that becomes visible during removal.

Tile, glass, and fixtures

Decide how high you want the tile to go and what you want included for glass and fixtures. Tile partway up a wall and tile to the ceiling cover different amounts of surface. We install only frameless glass. A fixed panel and an enclosure with a door have different parts and installation work. If you want a bench or recessed shelf, ask how it will be built, waterproofed, and finished. If you’re comparing quotes before making final selections, ask which products each quote includes and how much it sets aside for choices you’ll make later.

How the work is scheduled

Start with the layout and the selections that affect it, especially the entry, valve, and tile coverage. The work generally moves through removal, plumbing and any needed floor or wall repairs, the shower base and waterproofing, and tile and grout. For made-to-fit glass, ask when the installer can measure the finished opening and when the glass can go in. Ask where glass, fixtures, and a final walkthrough fit in the schedule.

Find out which selections need to be ready before work starts and how long the shower will be out of use. Hidden damage or a wait for glass can change the finish date. If this is your only shower, plan where you’ll bathe while it’s out of use. Check with the city about requirements for your specific scope and ask how any applicable steps fit into the schedule.

What to look for in a written estimate

Every job gets a written quote with the scope spelled out. When comparing quotes, check that each covers the same footprint, entry, plumbing changes, tile coverage, glass, and fixtures. Look at what’s excluded and how much is set aside for choices you haven’t made. Ask how any extra work found during removal would be described, priced, and approved. A sketch or a few photos can help you point out details like a window in the shower, the door swing, or the part of the bathroom floor you want to keep. If you’re keeping part of the old tile, ask how the new finish will meet it. Write those details into the scope before you compare prices.

Walk-in shower FAQs

Can I replace the shower and keep the rest of the bathroom?

Yes, a shower-only scope can leave the vanity and other parts of the room in place. Ask the remodeler to show where the shower work ends and whether the tile edge or flooring at that boundary will need attention.

Does a no-step entry affect the cost?

A curbless entry adds $3,500 to a shower-only rebuild or a tub-to-shower conversion. Have the remodeler check the floor, drain, and shower opening to see whether a no-step entry fits your layout.

When should I choose the glass?

Discuss the panel or door layout before the shower is built so the opening works for the way you’ll use it. For made-to-fit glass, ask whether the installer needs to wait until the tile is in place before taking final measurements.

How long will my shower be out of use?

Ask for a schedule based on your scope and the materials you choose. Removal, repairs, and glass fabrication can affect when the shower is ready again. Ask for the expected out-of-use period as well as the overall project schedule.

Talk through your Aledo shower

Bring photos of your current bathroom and a short list of what you want to keep or change. Call Salvation Home Remodeling at 817-210-7117 to discuss your walk-in shower.

Our warranty is 3 years on anything we touch + 5 years workmanship.

Planning a bathroom remodel? Tell us what you want to change. 3 quick taps, then we call you.

Plan my remodelSee our work

Service Area Map
Job costs tracked with Job Cost Pro — built by our owner.

Privacy Policy

Salvation Home Remodeling
Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.